Every reserve movement on a claim is a movement in what reinsurers owe. When claims and reinsurance live in separate systems, reinsurance learns about those movements at bordereau time — monthly or quarterly — and the first sign of a large loss in the treaty is a number that has already been on the claim for weeks. InsightCW and InsightCede share claim movements as they happen.

What Cede receives

EventWhat Cede does with it
claim.reserve_movementCedes the movement to the treaties that attach
claim.payment_issuedCedes the paid loss
claim.payment_voidedTakes the paid cession back
claim.recovery_receivedA contra cession: the recovery reduces what is ceded
claim.closed / claim.reopenedStatus for the ceded record
claim.large_lossThe reinsurers' large-loss notice
cat.event_lossA catastrophe's roll-up: recorded as a notice with the position against each CAT XoL treaty in force; never a second cession

Each claim event carries the policy inception, so a risks-attaching treaty is matched on when the policy incepted rather than when the loss happened, and the catastrophe code where the claim is tagged to an event.

flowchart LR A["Reserve or payment
on a claim"] --> B["Outbox, same
transaction"] B --> C["Signed delivery
to Cede intake"] C --> D["Idempotent on
event id"] D --> E["Cessions to the
treaties that attach"] E --> F["Cede's net back to the
reserving worksheet"] style E fill:#efeafe,stroke:#7c6cf0

And back again

The reserving worksheet reads, for each claim, what InsightCede publishes as its net — what is recoverable — read-only over Cede's data API, or says why it cannot. An adjuster setting a reserve on a large loss sees the gross and the net side by side.

The reserve zone with current, suggested and ultimate, the authority line and the worksheet, on demo data
The reserve zone on a general liability claim (demo data): $69,500 outstanding against a suggested $142,500 and an ultimate of $193,500, $44,500 above the owner's authority, every move with its reason, the feature by component and the worksheet's checks.

Why the catastrophe roll-up is not a cession

Each claim's movements already cede as they happen. Ceding the event total again would count the same dollars twice. The roll-up exists so reinsurance can see the occurrence against each catastrophe layer next to the per-claim ledger. See the CAT surge use case.

Keep reading